• ISA 77.43-1994

ISA 77.43-1994

  • standard by The International Society of Automation, 04/01/1994
  • Fossil Fuel Power Plant Unit - Plant Demand Development, Drum Type : S77.43
  • Category: ISA

$255.00 $128.00

Full Description

Formerly S77.43-1994. Addresses the unit/plant demand development subsystem for boilers with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes firing rate demand development, throttle/header pressure control, and unit megawatt/steam flow control as applicable. Addresses: (1) a single boiler supplying a single turbine, typical of an electric utility power plant and (2) a single or multiple boiler supplying a common distribution header, typical of an industrial power plant. Specifically excluded are: dispatch control; turbine/generator control (other than turbine demand); combustion controls (covered by ISA-S77.41); steam distribution control systems; economic loading of boilers; and fluidized bed boilers.

Product Details

Published:
04/01/1994
ISBN(s):
1556174950
ANSI:
ANSI Approved
Number of Pages:
26

Document History

ISA 77.43.01-2014

ISA 77.43.01-2002 (R2008)

ISA 77.43-1994

ISA 60079-26 (12.00.03)-2011

ISA 60079-26 (12.00.03)-2011

Electrical Apparatus for Use in Class I, Zone 0 Hazardous (Classified) Locations..

$74.00 $148.00

ISA 100.11a-2011

ISA 100.11a-2011

Wireless systems for industrial automation: Process control and related applications..

$152.00 $303.00

ISA 62381-2011 (IEC 62381 Modified)

ISA 62381-2011 (IEC 62381 Modified)

Automation Systems in the Process Industry - Factory Acceptance Test (FAT), Site Acceptance Test (SA..

$158.00 $315.00

ISA 88.00.01-2010

ISA 88.00.01-2010

Batch Control Part 1: Models and Terminology..

$124.00 $248.00