• SAE ARP6028

SAE ARP6028

  • standard by SAE International, 03/13/2009
  • CONFIGURATION CONTROL FOR MAINTAINING CORRELATION OF GAS TURBINE ENGINE TEST CELLS
  • Category: SAE

$66.00 $33.00

Full Description

The configuration of a test facility that exists at the time when a correlation is being carried out should be "base lined" as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control.This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance. If such a change occurs then this should be judged by the respective OEM's or designated correlation approval authorities Subject Matter Expert (SME). In some cases, this may involve consultation with the engine project customer or airworthiness authorities.This paper can be considered applicable to all types and standards of test facilies in the aero, marine and industrial gas turbine engine businesses.

Product Details

Published:
03/13/2009
File Size:
1 file , 96 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus

Document History

SAE ARP6028A

SAE ARP6028

SAE J3088_201711

SAE J3088_201711

Active Safety System Sensors..

$72.00 $143.00

SAE AS81099A

SAE AS81099A

Electric Devices, Simple, General Specification For (Stabilized: Nov 2017)..

$38.00 $76.00

SAE ARP4729A

SAE ARP4729A

Document for 270 Voltage Direct Current (270 V DC) System (Stabilized: Nov 2017)..

$66.00 $131.00

SAE AIR1213A

SAE AIR1213A

Radioisotope Power Systems (Stabilized: Nov 2017)..

$56.00 $112.00